Find Your
Perfect Choice
Let's Build Together!
We know building your dream home, office, or factory is a big deal. That’s why we’ve created flexible packages to fit every need and budget. Whether you’re dreaming of a cozy cottage, a bustling business hub, or a massive industrial complex, we’ve got you covered.
*Choose Your City from below
Designs & Drawings
- 3D Elevation
- Architerctural Layout
Structure
- Foundation: DR masonry (60cm x60cm), RR basement (45cm x45cm)
- Belt: (30cm x15cm)
- Masonry works using good quality laterite (upto55rs)/Cement concrete bricks.
- Concrete works (20mm &40mm crushed aggregates of M20 mix for RCC and M7.5mix for PCC)
- Cement : Ultratech / ACC / Shankar / Malabar / Penna / Chettinad
- Steel: Kairali, Kaliyath etc.
- Height: 320cm
- Parapet: 60cm (cement concrete bricks 4’)
Basic Electrical
- Conduit Pipes: ISI
- Co Boxes, Switches and Sockets: GM GXAce/Equivalent
- Layout as per the standard including provisions for AC (bedroom)
Doors & Windows
- Main door Frame: Wood door (Teak,Anjili,Plavu) (Upto:₹6000)
- Other door frames: Steel (Tata16 Guage galvano frame)
- Window frame: (Tata16 Guage galvano frame)
- Windows panel: (Tata16 Guage galvano frame)
Note
- Rubble foundation is considered up to a depth of 60 cm. Any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 1,500 sq.ft or above.
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- Water & electricity for site shall be provided by the client.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Floor height is considered at 3 m from floor level to top of the slab. Any changes in this shall be claimed accordingly.
- Sloped roof, Rainwater storage sump, percolation pit are excluded from this package.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item not mentioned in the package is additional.
Designs & Drawings
- 3D Elevation
- Architerctural Layout
Structure
- Foundation: DR masonry (60cm x60cm), RR basement (45cm x45cm)
- Belt: (30cm x15cm)
- Masonry works using good quality laterite (upto55rs)/Cement concrete bricks.
- Concrete works (20mm &40mm crushed aggregates of M20 mix for RCC and M7.5mix for PCC)
- Cement : Ultratech / ACC / Shankar / Malabar / Penna / Chettinad
- Steel: Kairali, Kaliyath etc.
- Height: 320cm
- Parapet: 60cm (cement concrete bricks 4’)
Basic Electrical
- Conduit Pipes: ISI
- Co Boxes, Switches and Sockets: GM GXAce/Equivalent
- Layout as per the standard including provisions for AC (bedroom)
Doors & Windows
- Main door Frame: Wood door (Teak,Anjili,Plavu) (Upto:₹6000)
- Other door frames: Steel (Tata16 Guage galvano frame)
- Window frame: (Tata16 Guage galvano frame)
- Windows panel: (Tata16 Guage galvano frame)
Note
- Rubble foundation is considered up to a depth of 60 cm. Any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 1,500 sq.ft or above.
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- Water & electricity for site shall be provided by the client.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Floor height is considered at 3 m from floor level to top of the slab. Any changes in this shall be claimed accordingly.
- Sloped roof, Rainwater storage sump, percolation pit are excluded from this package.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item not mentioned in the package is additional.
Designs & Drawings
- 3D Elevation
- Architerctural Layout
Structure
- Foundation: DR masonry (60cm x60cm), RR basement (45cm x45cm)
- Belt: (30cm x15cm)
- Masonry works using good quality laterite (upto55rs)/Cement concrete bricks.
- Concrete works (20mm &40mm crushed aggregates of M20 mix for RCC and M7.5mix for PCC)
- Cement : Ultratech / ACC / Shankar / Malabar / Penna / Chettinad
- Steel: Kairali, Kaliyath etc.
- Height: 320cm
- Parapet: 60cm (cement concrete bricks 4’)
Basic Electrical
- Conduit Pipes: ISI
- Co Boxes, Switches and Sockets: GM GXAce/Equivalent
- Layout as per the standard including provisions for AC (bedroom)
Doors & Windows
- Main door Frame: Wood door (Teak,Anjili,Plavu) (Upto:₹6000)
- Other door frames: Steel (Tata16 Guage galvano frame)
- Window frame: (Tata16 Guage galvano frame)
- Windows panel: (Tata16 Guage galvano frame)
Note
- Rubble foundation is considered up to a depth of 60 cm. Any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 1,500 sq.ft or above.
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- Water & electricity for site shall be provided by the client.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Floor height is considered at 3 m from floor level to top of the slab. Any changes in this shall be claimed accordingly.
- Sloped roof, Rainwater storage sump, percolation pit are excluded from this package.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item not mentioned in the package is additional.
* Choose Your City from below
Designs & Drawings
- 3D Elevation
- Architerctural Layout | 2D
- Basic Elevation
- Structural Design
- 360/VR Walkthrough
Structure
- Foundation – DR masonry (60 cm x 60 cm), RR basement (45 cm x 30 cm).
- Plinth filling using available soil.
- Masonry works using good quality cement concrete bricks.
- Concrete works using 20 mm & 40 mm crushed aggregates of M20 mix for RCC and M7.5 mix for PCC.
- Damp proof course on plinth beam.
- Anti-termite treatment will be provided after plinth level backfilling.
- Cement : Penna / Chettinad
- Steel : Kalliyath TMT.
Electrical
- Wires : V-guard / Equivalent brand.
- Boxes, switches and sockets : GM GX Ace / Equivalent
- Layout as per the standard including provisions for AC (all bedrooms) and geyser (all toilets).
Plumbing & Sanitary
- Plumbing : Pipes & fittings of Kelachandra / Goodwill / Equivalent.
- Sanitary & CP fittings up to Rs. 15,000 / Toilet of Parryware / Equivalent.
- 1000L 3 layer PVC water tank.
- 2000L readymade ferrocement septic tank.
Doors & Windows
- Main door : Steel door (up to Rs. 24,000 / piece). Brand: Hawaii / Equivalent.
- External door : Steel door (up to Rs 16,000 / piece).
- Internal door : Flush doors (up to Rs. 8,000 / piece).
- Toilet door : PVC doors (up to Rs. 4,500 / piece).
- Windows : 2 Track Aluminium Sliding Window with MS grills.
- MS Handrail for staircase (up to 600 Rs / ft)
Flooring
- Flooring using vitrified tiles, laid using cement: sand mortar with joint filler.
- Ceramic / vitrified toilet floor tiles with joint filler.
- Ceramic / vitrified toilet wall tiles with joint filler up to 7 feet height.
- Material cost up to – Rs. 40 / sqft for main flooring, Rs. 40 /sqft for toilet.
- Toilet floor and wall (up to 45 cm) waterproofing.
Wall Finishes
- Internal Painting – 2 coat putty(living, dininig & master bedroom), 1 coat primer & 2 coat emulsion. Brand: Asian Apcolite Premium Emulsion / Equivalent
- External Painting – 1 coat primer & 2 coat emulsion.Brand: Asian Apex Emulsion / Equivalent
- Front Elevation 2 coat putty.
Kitchen & Dining Area
- Granite kitchen countertop up to Rs. 200 / sqft, SS single bowl sink with drain board & sink faucet.
- Dado tiles in kitchen up to Rs. 60 / sqft (2’ height).
- Wall hung washbasin in dining area with CP fittings of Cera / Equivalent brand with towel rod, mirror and soap dish.
Note
- Rubble foundation is considered up to a depth of 60 cm. Any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 1,500 sq.ft or above.
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- Water & electricity for site shall be provided by the client.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Floor height is considered at 3 m from floor level to top of the slab. Any changes in this shall be claimed accordingly.
- Sloped roof, Rainwater storage sump, percolation pit are excluded from this package.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item not mentioned in the package is additional.
Designs & Drawings
- 3D Elevation
- Architerctural Layout | 2D
- Basic Elevation
- Structural Design
- 360/VR Walkthrough
Structure
- Foundation – DR masonry (60 cm x 60 cm), RR basement (45 cm x 30 cm).
- Plinth filling using available soil.
- Masonry works using good quality cement concrete bricks.
- Concrete works using 20 mm & 40 mm crushed aggregates of M20 mix for RCC and M7.5 mix for PCC.
- Damp proof course on plinth beam.
- Anti-termite treatment will be provided after plinth level backfilling.
- Cement : Penna / Chettinad
- Steel : Kalliyath TMT.
Electrical
- Wires : V-guard / Equivalent brand.
- Boxes, switches and sockets : GM GX Ace / Equivalent
- Layout as per the standard including provisions for AC (all bedrooms) and geyser (all toilets).
Plumbing & Sanitary
- Plumbing : Pipes & fittings of Kelachandra / Goodwill / Equivalent.
- Sanitary & CP fittings up to Rs. 15,000 / Toilet of Parryware / Equivalent.
- 1000L 3 layer PVC water tank.
- 2000L readymade ferrocement septic tank.
Doors & Windows
- Main door : Steel door (up to Rs. 24,000 / piece). Brand: Hawaii / Equivalent.
- External door : Steel door (up to Rs 16,000 / piece).
- Internal door : Flush doors (up to Rs. 8,000 / piece).
- Toilet door : PVC doors (up to Rs. 4,500 / piece).
- Windows : 2 Track Aluminium Sliding Window with MS grills.
- MS Handrail for staircase (up to 600 Rs / ft)
Flooring
- Flooring using vitrified tiles, laid using cement: sand mortar with joint filler.
- Ceramic / vitrified toilet floor tiles with joint filler.
- Ceramic / vitrified toilet wall tiles with joint filler up to 7 feet height.
- Material cost up to – Rs. 40 / sqft for main flooring, Rs. 40 /sqft for toilet.
- Toilet floor and wall (up to 45 cm) waterproofing.
Wall Finishes
- Internal Painting – 2 coat putty(living, dininig & master bedroom), 1 coat primer & 2 coat emulsion. Brand: Asian Apcolite Premium Emulsion / Equivalent
- External Painting – 1 coat primer & 2 coat emulsion.Brand: Asian Apex Emulsion / Equivalent
- Front Elevation 2 coat putty.
Kitchen & Dining Area
- Granite kitchen countertop up to Rs. 200 / sqft, SS single bowl sink with drain board & sink faucet.
- Dado tiles in kitchen up to Rs. 60 / sqft (2’ height).
- Wall hung washbasin in dining area with CP fittings of Cera / Equivalent brand with towel rod, mirror and soap dish.
Note
- Rubble foundation is considered up to a depth of 60 cm. Any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 1,500 sq.ft or above.
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- Water & electricity for site shall be provided by the client.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Floor height is considered at 3 m from floor level to top of the slab. Any changes in this shall be claimed accordingly.
- Sloped roof, Rainwater storage sump, percolation pit are excluded from this package.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item not mentioned in the package is additional.
Designs & Drawings
- 3D Elevation
- Architerctural Layout
Structure
- Foundation: DR masonry (60cm x60cm), RR basement (45cm x45cm)
- Belt: (30cm x15cm)
- Masonry works using good quality laterite (upto55rs)/Cement concrete bricks.
- Concrete works (20mm &40mm crushed aggregates of M20 mix for RCC and M7.5mix for PCC)
- Cement : Ultratech / ACC / Shankar / Malabar / Penna / Chettinad
- Steel: Kairali, Kaliyath etc.
- Height: 320cm
- Parapet: 60cm (cement concrete bricks 4’)
Basic Electrical
- Conduit Pipes: ISI
- Co Boxes, Switches and Sockets: GM GXAce/Equivalent
- Layout as per the standard including provisions for AC (bedroom)
Doors & Windows
- Main door Frame: Wood door (Teak,Anjili,Plavu) (Upto:₹6000)
- Other door frames: Steel (Tata16 Guage galvano frame)
- Window frame: (Tata16 Guage galvano frame)
- Windows panel: (Tata16 Guage galvano frame)
Note
- Rubble foundation is considered up to a depth of 60 cm. Any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 1,500 sq.ft or above.
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- Water & electricity for site shall be provided by the client.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Floor height is considered at 3 m from floor level to top of the slab. Any changes in this shall be claimed accordingly.
- Sloped roof, Rainwater storage sump, percolation pit are excluded from this package.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item not mentioned in the package is additional.
*Choose Your City from below
Designs & Drawings
- 3D Elevation
- Architerctural Layout | 2D
- Basic Elevation
- Structural Design
- 360/VR Walkthrough
Structure
- Foundation – DR masonry (60 cm x 60 cm), RR basement (45 cm x 30 cm).
- Plinth Beam (20 cm x 15 cm), plinth filling using available soil.
- Masonry works using good quality cement concrete bricks.
- Concrete works using 20 mm & 40 mm crushed aggregates of M20 mix for RCC and M7.5 mix for PCC.
- Damp proof course on plinth beam.
- Anti-termite treatment will be provided after plinth level backfilling.
- Cement : ACC / Ramco / Sankar / Equivalent.
- Steel : Kalliyath TMT.
Electrical
- Wires : RR Kabel / Equivalent brand.
- Boxes, switches and sockets : L&T Entice.
- Layout as per the standard including provisions for AC (all bedrooms) and geyser (all toilets).
Plumbing & Sanitary
- Plumbing : Pipes & fittings of Star / Equivalent.
- Sanitary & CP fittings up to Rs. 20,000 / Toilet of Cera / Equivalent Brand.
- 1000L 3 layer PVC water tank.
- 2000L readymade ferrocement septic tank.
Doors & Windows
- Main door : Steel door (up to Rs. 30,000 / piece). Brand: Hawaii / Equivalent.
- External door : Steel door (up to Rs 18,000 / piece).
- Internal door : FRP doors (up to Rs. 11,000 / piece).
- Toilet door : FRP door (up to Rs. 7,000 / piece).
- Windows : Steel windows / uPVC white profile sliding windows with grills.
- MS Handrail for staircase, balcony (up to 15 ft) (rate up to Rs. 800 / ft).
Flooring
- Flooring using vitrified tiles, laid using cement: sand mortar with joint filler.
- Ceramic / vitrified toilet floor tiles with epoxy filler.
- Ceramic / vitrified toilet wall tiles with epoxy filler up to 7 feet height.
- Material cost up to – Rs. 60 / sqft for main flooring, Rs. 60 /sqft for toilet.
- Toilet floor and wall (up to 45 cm) waterproofing.
Wall Finishes
- Internal Painting – 2 coat putty(living, dininig & master bedroom), 1 coat primer & 2 coat emulsion. Brand: Asian Apcolite Premium Emulsion / Equivalent.
- External Painting – 1 coat primer & 2 coat emulsion.Brand: Asian Apex Emulsion / Equivalent.
- Front Elevation 2 coat putty.
Kitchen & Dining Area
- Granite kitchen countertop up to Rs. 200 / sqft, SS single bowl sink with drain board & sink faucet.
- Dado tiles in kitchen up to Rs. 60 / sqft (2’ height).
- Wall hung washbasin in dining area with CP fittings of Cera / Equivalent brand with towel rod, mirror and soap dish.
Note
- Rubble foundation is considered up to a depth of 60 cm. Any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 1,500 sq.ft or above.
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- Water & electricity for site shall be provided by the client.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Floor height is considered at 3 m from floor level to top of the slab. Any changes in this shall be claimed accordingly.
- Sloped roof, Rainwater storage sump, percolation pit are excluded from this package.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item not mentioned in the package is additional.
Designs & Drawings
- 3D Elevation
- Architerctural Layout | 2D
- Basic Elevation
- Structural Design
- 360/VR Walkthrough
Structure
- Foundation – DR masonry (60 cm x 60 cm), RR basement (45 cm x 30 cm).
- Plinth Beam (20 cm x 15 cm), plinth filling using available soil.
- Masonry works using good quality cement concrete bricks.
- Concrete works using 20 mm & 40 mm crushed aggregates of M20 mix for RCC and M7.5 mix for PCC.
- Damp proof course on plinth beam.
- Anti-termite treatment will be provided after plinth level backfilling.
- Cement : ACC / Ramco / Sankar / Equivalent.
- Steel : Kalliyath TMT.
Electrical
- Wires : RR Kabel / Equivalent brand.
- Boxes, switches and sockets : L&T Entice.
- Layout as per the standard including provisions for AC (all bedrooms) and geyser (all toilets).
Plumbing & Sanitary
- Plumbing : Pipes & fittings of Star / Equivalent.
- Sanitary & CP fittings up to Rs. 20,000 / Toilet of Cera / Equivalent Brand.
- 1000L 3 layer PVC water tank.
- 2000L readymade ferrocement septic tank.
Doors & Windows
- Main door : Steel door (up to Rs. 30,000 / piece). Brand: Hawaii / Equivalent.
- External door : Steel door (up to Rs 18,000 / piece).
- Internal door : FRP doors (up to Rs. 11,000 / piece).
- Toilet door : FRP door (up to Rs. 7,000 / piece).
- Windows : Steel windows / uPVC white profile sliding windows with grills.
- MS Handrail for staircase, balcony (up to 15 ft) (rate up to Rs. 800 / ft).
Flooring
- Flooring using vitrified tiles, laid using cement: sand mortar with joint filler.
- Ceramic / vitrified toilet floor tiles with epoxy filler.
- Ceramic / vitrified toilet wall tiles with epoxy filler up to 7 feet height.
- Material cost up to – Rs. 60 / sqft for main flooring, Rs. 60 /sqft for toilet.
- Toilet floor and wall (up to 45 cm) waterproofing.
Wall Finishes
- Internal Painting – 2 coat putty(living, dininig & master bedroom), 1 coat primer & 2 coat emulsion. Brand: Asian Apcolite Premium Emulsion / Equivalent.
- External Painting – 1 coat primer & 2 coat emulsion.Brand: Asian Apex Emulsion / Equivalent.
- Front Elevation 2 coat putty.
Kitchen & Dining Area
- Granite kitchen countertop up to Rs. 200 / sqft, SS single bowl sink with drain board & sink faucet.
- Dado tiles in kitchen up to Rs. 60 / sqft (2’ height).
- Wall hung washbasin in dining area with CP fittings of Cera / Equivalent brand with towel rod, mirror and soap dish.
Note
- Rubble foundation is considered up to a depth of 60 cm. Any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 1,500 sq.ft or above.
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- Water & electricity for site shall be provided by the client.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Floor height is considered at 3 m from floor level to top of the slab. Any changes in this shall be claimed accordingly.
- Sloped roof, Rainwater storage sump, percolation pit are excluded from this package.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item not mentioned in the package is additional.
Designs & Drawings
- 3D Elevation
- Architerctural Layout | 2D
- Basic Elevation
- Structural Design
- 360/VR Walkthrough
Structure
- Foundation – DR masonry (60 cm x 60 cm), RR basement (45 cm x 30 cm).
- Plinth Beam (20 cm x 15 cm), plinth filling using available soil.
- Masonry works using good quality cement concrete bricks.
- Concrete works using 20 mm & 40 mm crushed aggregates of M20 mix for RCC and M7.5 mix for PCC.
- Damp proof course on plinth beam.
- Anti-termite treatment will be provided after plinth level backfilling.
- Cement : ACC / Ramco / Sankar / Equivalent.
- Steel : Kalliyath TMT.
Electrical
- Wires : RR Kabel / Equivalent brand.
- Boxes, switches and sockets : L&T Entice.
- Layout as per the standard including provisions for AC (all bedrooms) and geyser (all toilets).
Plumbing & Sanitary
- Plumbing : Pipes & fittings of Star / Equivalent.
- Sanitary & CP fittings up to Rs. 20,000 / Toilet of Cera / Equivalent Brand.
- 1000L 3 layer PVC water tank.
- 2000L readymade ferrocement septic tank.
Doors & Windows
- Main door : Steel door (up to Rs. 30,000 / piece). Brand: Hawaii / Equivalent.
- External door : Steel door (up to Rs 18,000 / piece).
- Internal door : FRP doors (up to Rs. 11,000 / piece).
- Toilet door : FRP door (up to Rs. 7,000 / piece).
- Windows : Steel windows / uPVC white profile sliding windows with grills.
- MS Handrail for staircase, balcony (up to 15 ft) (rate up to Rs. 800 / ft).
Flooring
- Flooring using vitrified tiles, laid using cement: sand mortar with joint filler.
- Ceramic / vitrified toilet floor tiles with epoxy filler.
- Ceramic / vitrified toilet wall tiles with epoxy filler up to 7 feet height.
- Material cost up to – Rs. 60 / sqft for main flooring, Rs. 60 /sqft for toilet.
- Toilet floor and wall (up to 45 cm) waterproofing.
Wall Finishes
- Internal Painting – 2 coat putty(living, dininig & master bedroom), 1 coat primer & 2 coat emulsion. Brand: Asian Apcolite Premium Emulsion / Equivalent.
- External Painting – 1 coat primer & 2 coat emulsion.Brand: Asian Apex Emulsion / Equivalent.
- Front Elevation 2 coat putty.
Kitchen & Dining Area
- Granite kitchen countertop up to Rs. 200 / sqft, SS single bowl sink with drain board & sink faucet.
- Dado tiles in kitchen up to Rs. 60 / sqft (2’ height).
- Wall hung washbasin in dining area with CP fittings of Cera / Equivalent brand with towel rod, mirror and soap dish.
Note
- Rubble foundation is considered up to a depth of 60 cm. Any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 1,500 sq.ft or above.
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- Water & electricity for site shall be provided by the client.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Floor height is considered at 3 m from floor level to top of the slab. Any changes in this shall be claimed accordingly.
- Sloped roof, Rainwater storage sump, percolation pit are excluded from this package.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item not mentioned in the package is additional.
*Choose Your City from below
Designs & Drawings
- 3D Elevation
- Architerctural Layout
Structure
- Foundation: RCC Column footing - Pit size: 1.5X1.5
- Pedestal Columns: 20X40 CM
- Plinth beam: 20X40 CM
- Columns: 20X40 CM
- Beams: 20X45 CM
- Main slabs: 12CM
- Masonry works using good quality Cement concrete bricks (up to Rs.55 )
- Concrete works (20mm &40mm crushed aggregates of M20 mix for RCC and M7.5mix for PCC)
- Cement : Ultratech / ACC / Shankar / Malabar / Penna / Chettinad
- Steel: Kairali, Kaliyath etc.
- Height: 320cm
- Parapet: 60cm (cement concrete bricks 4’)
Basic Electrical
- Conduit Pipes: ISI
- Co Boxes, Switches and Sockets: GM GXAce/Equivalent
- Layout as per the standard including provisions for AC (bedroom)
Note
- RCC foundation is considered up to a depth of 1.5M. any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 2000 SQFT or above
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- The client shall provide Water & electricity for site.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Floor height is considered at 3 m from floor level to top of the slab. Any changes in this shall be claimed accordingly.
- Sloped roof, Rainwater storage sump, percolation pit are excluded from this package.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item not mentioned in the package is additional.
Designs & Drawings
- 3D Elevation
- Architerctural Layout
Structure
- Foundation: RCC Column footing - Pit size: 1.5X1.5
- Pedestal Columns: 20X40 CM
- Plinth beam: 20X40 CM
- Columns: 20X40 CM
- Beams: 20X45 CM
- Main slabs: 12CM
- Masonry works using good quality Cement concrete bricks (up to Rs.55 )
- Concrete works (20mm &40mm crushed aggregates of M20 mix for RCC and M7.5mix for PCC)
- Cement : Ultratech / ACC / Shankar / Malabar / Penna / Chettinad
- Steel: Kairali, Kaliyath etc.
- Height: 320cm
- Parapet: 60cm (cement concrete bricks 4’)
Basic Electrical
- Conduit Pipes: ISI
- Co Boxes, Switches and Sockets: GM GXAce/Equivalent
- Layout as per the standard including provisions for AC (bedroom)
Note
- RCC foundation is considered up to a depth of 1.5M. any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 2000 SQFT or above
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- The client shall provide Water & electricity for site.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Floor height is considered at 3 m from floor level to top of the slab. Any changes in this shall be claimed accordingly.
- Sloped roof, Rainwater storage sump, percolation pit are excluded from this package.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item not mentioned in the package is additional.
Designs & Drawings
- 3D Elevation
- Architerctural Layout
Structure
- Foundation: RCC Column footing - Pit size: 1.5X1.5
- Pedestal Columns: 20X40 CM
- Plinth beam: 20X40 CM
- Columns: 20X40 CM
- Beams: 20X45 CM
- Main slabs: 12CM
- Masonry works using good quality Cement concrete bricks (up to Rs.55 )
- Concrete works (20mm &40mm crushed aggregates of M20 mix for RCC and M7.5mix for PCC)
- Cement : Ultratech / ACC / Shankar / Malabar / Penna / Chettinad
- Steel: Kairali, Kaliyath etc.
- Height: 320cm
- Parapet: 60cm (cement concrete bricks 4’)
Basic Electrical
- Conduit Pipes: ISI
- Co Boxes, Switches and Sockets: GM GXAce/Equivalent
- Layout as per the standard including provisions for AC (bedroom)
Note
- RCC foundation is considered up to a depth of 1.5M. any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 2000 SQFT or above
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- The client shall provide Water & electricity for site.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Floor height is considered at 3 m from floor level to top of the slab. Any changes in this shall be claimed accordingly.
- Sloped roof, Rainwater storage sump, percolation pit are excluded from this package.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item not mentioned in the package is additional.
*Choose Your City from below
Designs & Drawings
- 3D Elevation
- Architerctural Layout 2D
Structure
- Foundation: RCC Column footing - Pit size: 1.5X1.5
- Pedestal Columns: 20X40 CM
- Plinth beam: 20X40 CM
- Columns: 20X40 CM
- Beams: 20X45 CM
- Main slabs: 12CM
- Masonry works using good quality Cement concrete bricks (up to Rs.55 )
- Concrete works (20mm &40mm crushed aggregates of M20 mix for RCC and M7.5mix for PCC)
- Cement : Ultratech / ACC / Shankar / Malabar / Penna / Chettinad
- Steel: Kairali, Kaliyath etc.
Note
- RCC foundation is considered up to a depth of 1.5M. any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 2000 SQFT or above
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- The client shall provide Water & electricity for site.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item or specifications above are not mentioned in the package is additional
- Additional retaining wall, Waste water tank, leach pits, fire tank, water tank are not included in the quote.
Designs & Drawings
- 3D Elevation
- Architerctural Layout
Structure
- Foundation: DR masonry (60cm x60cm), RR basement (45cm x45cm)
- Belt: (30cm x15cm)
- Masonry works using good quality laterite (upto55rs)/Cement concrete bricks.
- Concrete works (20mm &40mm crushed aggregates of M20 mix for RCC and M7.5mix for PCC)
- Cement : Ultratech / ACC / Shankar / Malabar / Penna / Chettinad
- Steel: Kairali, Kaliyath etc.
- Height: 320cm
- Parapet: 60cm (cement concrete bricks 4’)
Basic Electrical
- Conduit Pipes: ISI
- Co Boxes, Switches and Sockets: GM GXAce/Equivalent
- Layout as per the standard including provisions for AC (bedroom)
Doors & Windows
- Main door Frame: Wood door (Teak,Anjili,Plavu) (Upto:₹6000)
- Other door frames: Steel (Tata16 Guage galvano frame)
- Window frame: (Tata16 Guage galvano frame)
- Windows panel: (Tata16 Guage galvano frame)
Note
- Rubble foundation is considered up to a depth of 60 cm. Any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 1,500 sq.ft or above.
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- Water & electricity for site shall be provided by the client.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Floor height is considered at 3 m from floor level to top of the slab. Any changes in this shall be claimed accordingly.
- Sloped roof, Rainwater storage sump, percolation pit are excluded from this package.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item not mentioned in the package is additional.
Designs & Drawings
- 3D Elevation
- Architerctural Layout
Structure
- Foundation: RCC Column footing - Pit size: 1.5X1.5
- Pedestal Columns: 20X40 CM
- Plinth beam: 20X40 CM
- Columns: 20X40 CM
- Beams: 20X45 CM
- Main slabs: 12CM
- Masonry works using good quality Cement concrete bricks (up to Rs.55 )
- Concrete works (20mm &40mm crushed aggregates of M20 mix for RCC and M7.5mix for PCC)
- Cement : Ultratech / ACC / Shankar / Malabar / Penna / Chettinad
- Steel: Kairali, Kaliyath etc.
Basic Electrical
- Conduit Pipes: ISI
- Co Boxes, Switches and Sockets: GM GXAce/Equivalent
- Layout as per the standard including provisions for AC (bedroom)
Doors & Windows
- Main door Frame: Wood door (Teak,Anjili,Plavu) (Upto:₹6000)
- Other door frames: Steel (Tata16 Guage galvano frame)
- Window frame: (Tata16 Guage galvano frame)
- Windows panel: (Tata16 Guage galvano frame)
Note
- Rubble foundation is considered up to a depth of 60 cm. Any change in depth shall be charged accordingly on actuals upon the site conditions.
- The package is applicable only for a minimum built up area of 1,500 sq.ft or above.
- Tree cutting/site leveling are excluded from this package.
- The site is considered to be at road level in this package & plinth level to be at 45 cm height from ground level. Any changes in this, plot filling, shall be charged accordingly.
- All the works shall be carried out as per the drawings. Any changes in the drawing as per client interest shall be charged accordingly.
- Water & electricity for site shall be provided by the client.
- Rock cutting/ blasting/ compressor work is not included in this quote.
- Floor height is considered at 3 m from floor level to top of the slab. Any changes in this shall be claimed accordingly.
- Sloped roof, Rainwater storage sump, percolation pit are excluded from this package.
- Any municipal permissions, demolition/dismantling of existing structure, bore well, motors, water connection, rock cutting, sewage works shall be borne by the client.
- Base rate of steel – 68/kg, cement – 390/bag in the package.
- Any item not mentioned in the package is additional.